Close Menu
Kaohsiung Times

    Traffic ticket labels Kaohsiung man’s wife as ‘dangerous goods’ after police error

    Starlight Riverside Park water play area to open May 30

    A Green Bridge: Why Taiwan and India are natural allies in climate policy

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Friday, May 29
    Facebook X (Twitter) Instagram
    • Latest
    • Kaohsiung
    • South
      • Pingtung
      • Tainan
      • Chiayi
    • Crime
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Politics
    • Lifestyle
      • Sports
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Kaohsiung
    • South
    • Crime
    • Business
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » Kaohsiung Council Session Opens as Mayor Outlines Water Supply Situation, Flood Prevention Work, and Infrastructure Projects
    Local March 30, 20261 Min Read

    Kaohsiung Council Session Opens as Mayor Outlines Water Supply Situation, Flood Prevention Work, and Infrastructure Projects

    Mayor Chen says water supply currently stable, but drought preparedness is ongoing
    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    By KHT Staff

    KAOHSIUNG — The 7th regular session of the 4th Kaohsiung City Council opened Monday, with Mayor Chen Chi-mai outlining city measures on water supply and ongoing infrastructure projects.

    Chen said Kaohsiung’s daily water supply capacity is about 1.6 million metric tons, with current usage around 1.5 million tons, including roughly 300,000 tons for industrial use. He said supply and demand remain stable. The city has also prepared contingency measures, including 110 groundwater wells in Dashu District (大樹區) and subsurface water sources capable of supplying about 340,000 tons, allowing flexible allocation depending on conditions.

    Chen said the city will continue advancing major infrastructure and cross-year projects, including the New Provincial Highway 17 (新台17線) and Baguo Bridge (八涳橋) upgrades, while strengthening flood prevention measures ahead of the rainy season.

    According to the council agenda, mayoral policy reports and questioning will take place March 31 and April 1, followed by general interpellation sessions from May 11 to May 25. The session is scheduled to close on June 4.

    Source: Kaohsiung City Government

    Chen Chi-mai (陳其邁) Hero
    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    Traffic ticket labels Kaohsiung man’s wife as ‘dangerous goods’ after police error

    May 28, 2026

    Starlight Riverside Park water play area to open May 30

    May 27, 2026

    Zuoying social housing near THSR station starts at about NT$5,500

    May 27, 2026
    Add A Comment

    Comments are closed.

    Traffic ticket labels Kaohsiung man’s wife as ‘dangerous goods’ after police error

    May 28, 2026

    Starlight Riverside Park water play area to open May 30

    May 27, 2026

    Zuoying social housing near THSR station starts at about NT$5,500

    May 27, 2026

    K-SPARK concert traffic controls announced for Kaohsiung National Stadium

    May 27, 2026

    City shortens red lights to reduce summer heat exposure

    May 26, 2026

    Traffic ticket labels Kaohsiung man’s wife as ‘dangerous goods’ after police error

    Starlight Riverside Park water play area to open May 30

    A Green Bridge: Why Taiwan and India are natural allies in climate policy

    Zuoying social housing near THSR station starts at about NT$5,500

    K-SPARK concert traffic controls announced for Kaohsiung National Stadium

    City shortens red lights to reduce summer heat exposure

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Contact Info
    • Privacy Policy & GDPR
    © 2026 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.