Close Menu
Kaohsiung Times

    “Dream Forest Park” nears completion north of Chengcing Lake.

    Scooter rider blames ginger duck meal for breath test exceeding 0.8 mg/L, then confesses

    Opinion: The KMT risks undermining its own argument on judicial caning

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Friday, October 2
    Facebook X (Twitter) Instagram
    • Latest
    • Kaohsiung
    • South
      • Pingtung
      • Tainan
      • Chiayi
    • Crime
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Politics
    • Lifestyle
      • Sports
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Kaohsiung
    • South
    • Crime
    • Business
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » Five MRT construction projects win engineering quality awards
    Design October 2, 20262 Mins Read

    Five MRT construction projects win engineering quality awards

    Work on the Siaogang–Linyuan extension receives the highest distinction, while two Yellow Line contracts also earn safety honors
    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    By KHT Staff. Images via KH City MRT Bureau.

    KAOHSIUNG — Five MRT construction contracts spanning the Siaogang–Linyuan extension (小港林園線), Gangshan–Lujhu extension (岡山路竹延伸線) and Yellow Line (黃線) have received honors at the 2026 City Engineering Quality Gold Awards (城市工程品質金質獎).

    The Siaogang–Linyuan extension’s RLC01 contract received the competition’s highest distinction, the special excellence gold award (特優金質獎), according to the Mass Rapid Transit Bureau’s announcement. The other four contracts received gold awards, with two Yellow Line contracts also recognized for occupational health and safety.

    The winning projects were:

    ProjectContractAward
    Siaogang–Linyuan extensionRLC01Special excellence gold
    Gangshan–Lujhu extensionRKC02Gold
    Yellow Line’s Niaosong depot (鳥松機廠)YM01 depot worksGold
    Yellow Line constructionYC01Gold; occupational health and safety
    Yellow Line constructionYC03Gold; occupational health and safety

    The bureau identified the contractors as RSEA Engineering (榮工工程) for RLC01, Far Eastern Construction (遠揚營造) for RKC02, Te Chang Construction (德昌營造) for the depot works, Gamuda (金務大工程) for YC01 and Kung Sing Engineering (工信工程) for YC03.

    Now in its 12th year, the awards are jointly organized by the city’s architects, structural engineers and civil engineers associations, with the Kaohsiung Architects Association (高雄市建築師公會) serving as this year’s executing organization.

    The bureau said judges from industry, government and academia conducted site inspections to assess construction quality, technical expertise and safety management. The awards recognize individual construction contracts within the wider MRT expansion program.

    Hero Kaohsiung redevelopment Kaohsiung transportation
    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    “Dream Forest Park” nears completion north of Chengcing Lake.

    October 2, 2026

    Scooter rider blames ginger duck meal for breath test exceeding 0.8 mg/L, then confesses

    October 2, 2026

    Opinion: The KMT risks undermining its own argument on judicial caning

    October 2, 2026
    Add A Comment

    Comments are closed.

    “Dream Forest Park” nears completion north of Chengcing Lake.

    October 2, 2026

    Scooter rider blames ginger duck meal for breath test exceeding 0.8 mg/L, then confesses

    October 2, 2026

    Opinion: The KMT risks undermining its own argument on judicial caning

    October 2, 2026

    Banana Pier restoration among 51 public projects recognized for engineering quality

    October 1, 2026

    Footbridge to link Guoling Park and Chengcing Lake as overnight road closures approach

    October 1, 2026

    “Dream Forest Park” nears completion north of Chengcing Lake.

    Scooter rider blames ginger duck meal for breath test exceeding 0.8 mg/L, then confesses

    Opinion: The KMT risks undermining its own argument on judicial caning

    Five MRT construction projects win engineering quality awards

    Banana Pier restoration among 51 public projects recognized for engineering quality

    Footbridge to link Guoling Park and Chengcing Lake as overnight road closures approach

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Contact Info
    • Privacy Policy & GDPR
    © 2026 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.