Close Menu
Kaohsiung Times

    Boy rescued after nearly four-hour search near Laiyi Bridge

    Maria Abe makes first appearance since pregnancy announcement at Kaohsiung Film Festival

    Global education conference returns to NSYSU after 15 years

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Sunday, October 11
    Facebook X (Twitter) Instagram
    • Latest
    • Kaohsiung
    • South
      • Pingtung
      • Tainan
      • Chiayi
    • Crime
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Politics
    • Lifestyle
      • Sports
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Kaohsiung
    • South
    • Crime
    • Business
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » KMT candidate questions efficacy of flood control spending in Kaohsiung
    高雄 August 26, 20262 Mins Read

    KMT candidate questions efficacy of flood control spending in Kaohsiung

    The KMT candidate and former interior minister urged a basin-wide review as residents described recurring inundation in low-lying Ziguan communities
    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    By KHT Staff.

    KAOHSIUNG — Kuomintang (KMT) mayoral candidate Ko Chih-en (柯志恩) and former Interior Minister Lee Hong-yuan (李鴻源) called Wednesday for a full review of flood controls along the Dianbao River (典寶溪) after heavy rain again inundated low-lying parts of Ziguan District (梓官區), according to a China Times report.

    Ko invited Lee, a water-resources specialist, to inspect the river on Wednesday, Aug. 26, and meet local councilors and neighborhood chiefs. They urged authorities to identify the sources of recurring flooding and develop technically verified remedies rather than focus on political arguments over regional spending.

    Lee calls for basin-wide assessment

    “The key is whether the money is being spent where it should be,” Lee said, according to the report.

    Lee said the river’s width varies along its course and that responsibility is divided among several agencies. He called for an integrated review of upstream inflows, detention capacity, downstream tide levels and floodgate operations, with responsibilities clearly assigned between central and local authorities.

    Ko also urged President Lai Ching-te (賴清德) to treat the criticism as a request for review rather than an attack. She said pumps, pumping stations and box culverts could be better maintained before storms, while hydraulic modeling should be used to test longer-term proposals.

    City points to completed and planned work

    In a June 27 Kaohsiung City Government statement issued before this week’s flooding, the city said work to expand the Lioucuo and Baimi detention basins and raise embankments along the Dianbao River and Daliao drainage channel had been completed.

    The statement also outlined planned projects costing NT$1.06 billion for additional detention capacity, bridge reconstruction and drainage diversion, as well as NT$1.29 billion for pumping stations and a coordinated control system serving three detention basins.

    The Kaohsiung Environmental Protection Bureau describes the Dianbao as a 32-kilometer regional drainage waterway with a watershed of about 107 square kilometers. It flows through several northern Kaohsiung districts before reaching the Taiwan Strait.

    Dianbao River flood control Heavy rain Kaohsiung Ko Chih-en Lee Hong-yuan Ziguan District
    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    Maria Abe makes first appearance since pregnancy announcement at Kaohsiung Film Festival

    October 10, 2026

    Nanzih freeway link will be completed by end of 2028, deputy mayor says

    October 8, 2026

    Opinion: Ko Chih-en must find her own way through the election fog

    October 8, 2026
    Add A Comment

    Comments are closed.

    Maria Abe makes first appearance since pregnancy announcement at Kaohsiung Film Festival

    October 10, 2026

    Nanzih freeway link will be completed by end of 2028, deputy mayor says

    October 8, 2026

    Opinion: Ko Chih-en must find her own way through the election fog

    October 8, 2026

    Kaohsiung councilor Lin Chih-hung challenges KMT’s Ko over cash payment timetable

    October 8, 2026

    Beyblade X and Pokémon tournaments scheduled for Double Ten holiday

    October 8, 2026

    Boy rescued after nearly four-hour search near Laiyi Bridge

    Maria Abe makes first appearance since pregnancy announcement at Kaohsiung Film Festival

    Global education conference returns to NSYSU after 15 years

    Nanzih freeway link will be completed by end of 2028, deputy mayor says

    Opinion: Ko Chih-en must find her own way through the election fog

    Kaohsiung councilor Lin Chih-hung challenges KMT’s Ko over cash payment timetable

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Contact Info
    • Privacy Policy & GDPR
    © 2026 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.