Close Menu
Kaohsiung Times

    Kaohsiung gas blast recovery lawsuit remains unresolved after 12 years

    Greenpeace poll finds nine in 10 Kaohsiung residents unaware of CPC cracker plan

    Kaohsiung to review green-building subsidies after audit flags low execution rates

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Thursday, September 10
    Facebook X (Twitter) Instagram
    • Latest
    • Kaohsiung
    • South
      • Pingtung
      • Tainan
      • Chiayi
    • Crime
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Politics
    • Lifestyle
      • Sports
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Kaohsiung
    • South
    • Crime
    • Business
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » Kaohsiung cruise terminal unveils 15th-floor harbor-view space
    Urban Future August 31, 20262 Mins Read

    Kaohsiung cruise terminal unveils 15th-floor harbor-view space

    A cafe operator is expected to be selected by late 2026 or early 2027, but no public opening date has been announced
    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    By KHT Staff

    KAOHSIUNG — Taiwan International Ports Corporation (臺灣港務股份有限公司, TIPC) has unveiled a 15th-floor, 360-degree observation space at Kaohsiung Port Cruise Terminal (高雄港旅運中心), but the area is not yet open to the public, according to the Liberty Times.

    TIPC expects to complete the process of recruiting a cafe operator by late 2026 or early 2027. No opening date has been announced, and the final layout and visitor arrangements will depend on the winning operator’s plans.

    The space overlooks Kaohsiung Port, Love River Bay (愛河灣), Kaohsiung Music Center (高雄流行音樂中心) and the Asia New Bay Area (亞洲新灣區), the city’s waterfront redevelopment district.

    TIPC Chairman Yung-Hui Chou (周永暉) told the Liberty Times that the company aims to attract 150,000 visits annually to the cruise building by working with the Kaohsiung City Government on port-area improvements, shore excursions and city tourism.

    Operations center links ports around Taiwan

    The cruise terminal also houses an operations and emergency coordination center that consolidates real-time information and critical systems from the seven international commercial ports and two domestic ports managed by TIPC.

    A separate ministry statement issued Aug. 28 said the center is intended to improve emergency reporting, monitor disasters and operating conditions, and support coordinated decisions across ports. The statement followed a ministry inspection on Aug. 26.

    The same agency statement said the building uses a smart microgrid, 12.7-kilowatt-peak solar installation and a 1-megawatt, 2-megawatt-hour energy storage system. TIPC estimates that the system can reduce annual carbon dioxide emissions by about 250 metric tons.

    Location and access

    The terminal is at No. 5 Haibian Road in Lingya District (苓雅區). The TIPC cruise portal lists the Kaohsiung Light Rail’s Cruise Terminal Station, C09, as about a one-minute walk from the building.

    Asia New Bay Area Cruise tourism Hero Kaohsiung Port Kaohsiung Port Cruise Terminal Lingya District Taiwan International Ports Corporation
    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    Kaohsiung gas blast recovery lawsuit remains unresolved after 12 years

    September 9, 2026

    Greenpeace poll finds nine in 10 Kaohsiung residents unaware of CPC cracker plan

    September 9, 2026

    Kaohsiung to review green-building subsidies after audit flags low execution rates

    September 9, 2026
    Add A Comment

    Comments are closed.

    Kaohsiung gas blast recovery lawsuit remains unresolved after 12 years

    September 9, 2026

    Greenpeace poll finds nine in 10 Kaohsiung residents unaware of CPC cracker plan

    September 9, 2026

    Kaohsiung to review green-building subsidies after audit flags low execution rates

    September 9, 2026

    Three nights of catch-up sleep did not undo visceral fat gain in small study

    September 9, 2026

    NT$160 million bridge planned beside historic Fongshan crossing

    September 9, 2026

    Kaohsiung gas blast recovery lawsuit remains unresolved after 12 years

    Greenpeace poll finds nine in 10 Kaohsiung residents unaware of CPC cracker plan

    Kaohsiung to review green-building subsidies after audit flags low execution rates

    Three nights of catch-up sleep did not undo visceral fat gain in small study

    NT$160 million bridge planned beside historic Fongshan crossing

    Siaogang Sports Center set to open by end of October

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Contact Info
    • Privacy Policy & GDPR
    © 2026 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.