Close Menu
Kaohsiung Times
    What's Hot

    Is Your Vocabulary ‘Giving’? The Must-Know Slang of the Moment

    Kaohsiung MRT Yellow Line Makes Progress, But Estimated Date of Completion Date Unclear

    SERIALIZED BOOK: “Wise Beyond its Size – 60 Lessons from 60 Years of Singapore”

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Wednesday, November 5
    Facebook X (Twitter) Instagram
    • Latest
    • Local
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Sports
    • Politics
    • Lifestyle
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Local
    • Business
    • Sports
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » Kaohsiung MRT Yellow Line Makes Progress, But Estimated Date of Completion Date Unclear
    Local November 5, 20253 Mins Read

    Kaohsiung MRT Yellow Line Makes Progress, But Estimated Date of Completion Date Unclear

    Line likely to open in stages from 2032 through 2034
    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    By Eryk Michael Smith

    Cover image via Taro News.

    Kaohsiung’s long-planned MRT Yellow Line (黃線) continues to move through its construction and planning phases, with portions of the route area now under staged works and additional station-area development planning underway. According to Taro News, “the Kaohsiung City Government says the full line will open in 2034. The partial opening of sections Y1 to Y5 and Y5 to Y18 (from the depot area to the Weiwuying district) could occur in 2032.“

    Liberty Times image shows Yellow Line construction area.

    The Yellow Line is planned as a 22.9-kilometer corridor with 23 stations, largely underground, connecting the city districts of Niaosong (鳥松), Sanmin (三民), Xinxing (新興), Lingya (苓雅), Qianzhen (前鎮), and Fengshan (鳳山). City officials have promoted the project as a cross-city connective trunk, designed to tie together the existing Red and Orange MRT lines, the Circular Light Rail, and Taiwan Railways stations. The proposed layout resembles a Y-shaped central spine, intended to allow smoother transfers between districts that currently rely heavily on road traffic.

    Although the line has been in planning and land-coordination stages for more than a decade, on-the-ground construction has been gradually increasing. Sections of road along the planned corridor have recently shifted to partial lane closures and “half-and-half” construction methods designed to maintain traffic while excavation and utilities relocation proceed. The city has stated that minimizing disruption to shops and neighborhoods is a priority, though businesses along certain corridors have expressed concerns about noise and access during longer construction phases.

    The project has also drawn attention in the real estate market. Some station-area zones—particularly in central Fengshan and around Chengcing (Chengqing) Lake (澄清湖)—have reportedly seen increased buying interest, with developers citing expected future accessibility. Urban planning reports indicate that several stations may be paired with Transit-Oriented Development (TOD) projects, which could bring mixed-use buildings, commercial space, and residential towers directly connected to station exits. However, those development proposals still require separate evaluation and approvals.

    As for the timeline, recent commentary from both municipal and media sources suggests that full operation remains close to a decade away, with partial openings possibly occurring earlier, depending on construction progress and central government funding schedules. In 2024, officials moved the completion date from 2032 to 2034. Original plans called for it to be ready by 2028. The latest available information indicates the city is not committing to a public service launch date, with reports emphasizing that engineering safety and phased completion will determine the final rollout.

    Once operational, the Yellow Line has the potential to reduce pressure on major east–west arterials and offer more direct transit access to universities, residential zones, and commercial districts. The project is also being positioned as part of Kaohsiung’s broader “30-minute life circle” strategy—a long-term effort to reduce commute times and expand city center economic activity.

    Sources:

    City MRT Bureau

    Yahoo News

    Vocus

    Taipei Times

    Taro News

    Featured Kaohsiung MRT
    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    Pingtung HSR: Planning Restarts, 2039 Opening Goal

    November 3, 2025

    Kaohsiung Arena to Glow Blue for SUPER JUNIOR’s 20th Anniversary Tour

    November 3, 2025

    Kaohsiung Main Station Opens New Features as Redevelopment of Transit Hub Moves Forward

    November 2, 2025
    Add A Comment
    Leave A Reply Cancel Reply

    Related Posts

    Pingtung HSR: Planning Restarts, 2039 Opening Goal

    November 3, 2025

    Kaohsiung Arena to Glow Blue for SUPER JUNIOR’s 20th Anniversary Tour

    November 3, 2025

    Kaohsiung Main Station Opens New Features as Redevelopment of Transit Hub Moves Forward

    November 2, 2025

    Subscribe to News

    Get the latest sports news from NewsSite about world, sports and politics.

    Advertisement
    Demo
    Advertisement
    Demo
    Latest Posts

    Is Your Vocabulary ‘Giving’? The Must-Know Slang of the Moment

    Kaohsiung MRT Yellow Line Makes Progress, But Estimated Date of Completion Date Unclear

    SERIALIZED BOOK: “Wise Beyond its Size – 60 Lessons from 60 Years of Singapore”

    Pingtung HSR: Planning Restarts, 2039 Opening Goal

    Kaohsiung Arena to Glow Blue for SUPER JUNIOR’s 20th Anniversary Tour

    Kaohsiung Main Station Opens New Features as Redevelopment of Transit Hub Moves Forward

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Classified Ads
    • Contact Info
    • Do Not Sell Data
    • GDPR Policy
    • Media Kits
    © 2025 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.