Close Menu
Kaohsiung Times

    Nanzih freeway link will be completed by end of 2028, deputy mayor says

    Opinion: Ko Chih-en must find her own way through the election fog

    Kaohsiung councilor Lin Chih-hung challenges KMT’s Ko over cash payment timetable

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Saturday, October 10
    Facebook X (Twitter) Instagram
    • Latest
    • Kaohsiung
    • South
      • Pingtung
      • Tainan
      • Chiayi
    • Crime
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Politics
    • Lifestyle
      • Sports
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Kaohsiung
    • South
    • Crime
    • Business
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » Team selected for NT$7 billion World Games MRT Station area redevelopment
    Urban Future September 20, 20262 Mins Read

    Team selected for NT$7 billion World Games MRT Station area redevelopment

    Four-building proposal near the R17 Station includes housing, offices, childcare and an MRT pedestrian link
    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    By KHT Staff. AI-generated image based on a rendering of the proposed R17 A6 redevelopment.

    KAOHSIUNG — A development team has been selected as the preferred applicant for a NT$7.2 billion urban renewal project beside Kaohsiung MRT’s R17 World Games Station (世運站).

    The team includes Ying Shun Construction (盈舜營造) and Kao Hsing Chang Iron & Steel Corp. (高興昌鋼鐵). Its selection allows the city to move toward negotiations and further approvals, but does not mean construction can begin immediately.

    The NT$7.2 billion figure represents estimated project investment rather than direct city government spending.

    The A5 and A6 blocks are southeast/east of R17 World Games Station. The National Stadium is on the western side of the station, effectively behind or outside the viewpoint used in the development renderings.

    Known as the A6-block public urban renewal project, the development covers approximately 10,609 square meters, or 3,209 ping. The selected proposal calls for four buildings.

    Under the plan, the city would receive a 17-story mixed-use building containing housing intended for skilled workers, Grade A office space, commercial areas, and public childcare facilities. The private development team would construct three additional 21-story buildings containing homes and commercial space.

    A raised pedestrian walkway is also planned between the development and the neighboring A5 block, providing a connection toward R17 station. Earlier city planning documents describe the route as an approximately 300-meter walk to the station, rather than a bridge leading directly to the MRT platform.

    The city has positioned the project as transit-oriented development intended to place homes, employment and public services within walking distance of the Red Line. Plans also call for accessible public areas, landscaping, earthquake-resistant construction and green-building certification.

    The site is approximately 1.5 kilometers from Taiwan Semiconductor Manufacturing Co.’s (TSMC, 台積電) Nanzih operations and one MRT stop from R18 Oil Refinery Elementary School Station (油廠國小站). City officials expect housing and office demand in northern Kaohsiung to increase as semiconductor investment expands along the industrial corridor.

    The A6 project forms part of a broader redevelopment plan around the World Games Station. The neighboring A5 block is being developed separately, but the two sites are expected to share pedestrian connections and public facilities in the long term.

    The city’s preliminary schedule allows approximately four and a half years for completion after construction is formally declared underway. A construction start date has not yet been announced.

    Kaohsiung redevelopment
    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    Nanzih freeway link will be completed by end of 2028, deputy mayor says

    October 8, 2026

    Kaohsiung councilor Lin Chih-hung challenges KMT’s Ko over cash payment timetable

    October 8, 2026

    Beyblade X and Pokémon tournaments scheduled for Double Ten holiday

    October 8, 2026
    Add A Comment

    Comments are closed.

    Nanzih freeway link will be completed by end of 2028, deputy mayor says

    October 8, 2026

    Kaohsiung councilor Lin Chih-hung challenges KMT’s Ko over cash payment timetable

    October 8, 2026

    Beyblade X and Pokémon tournaments scheduled for Double Ten holiday

    October 8, 2026

    A green light can still lead to a fine at Kaohsiung intersections

    October 7, 2026

    Takao Rock brings 20 acts to three free stages this weekend

    October 7, 2026

    Nanzih freeway link will be completed by end of 2028, deputy mayor says

    Opinion: Ko Chih-en must find her own way through the election fog

    Kaohsiung councilor Lin Chih-hung challenges KMT’s Ko over cash payment timetable

    Beyblade X and Pokémon tournaments scheduled for Double Ten holiday

    A green light can still lead to a fine at Kaohsiung intersections

    Takao Rock brings 20 acts to three free stages this weekend

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Contact Info
    • Privacy Policy & GDPR
    © 2026 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.