Close Menu
Kaohsiung Times

    Local Band Elephant Gym Opens “Micro Movement” Recording Studio

    First section of NT$98 billion Kaohsiung-Pingtung expressway to break ground

    Man rescued after four days trapped in mud in Kaohsiung mountains

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Tuesday, September 15
    Facebook X (Twitter) Instagram
    • Latest
    • Kaohsiung
    • South
      • Pingtung
      • Tainan
      • Chiayi
    • Crime
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Politics
    • Lifestyle
      • Sports
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Kaohsiung
    • South
    • Crime
    • Business
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » Former TRA workshop to become Taiwan’s largest semi-indoor playground
    Lifestyle July 31, 20262 Mins Read

    Former TRA workshop to become Taiwan’s largest semi-indoor playground

    Aug. 8 opening will turn part of Kaohsiung’s old railway repair site into a free family recreation space
    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    By KHT Staff. Images via KH City Govt.

    KAOHSIUNG — A former railway repair workshop that once helped keep Taiwan’s trains running will begin a new life next month as what local reports describe as Taiwan’s largest semi-indoor family playground.

    The playground, built inside part of the former Taiwan Railways Kaohsiung Workshop, is scheduled to open Aug. 8.

    The main recreation area covers about 1.5 hectares and includes more than 30 attractions, according to city officials and local reports.

    Facilities include climbing areas, slides, swings, water-play areas, sensory games, high-rope equipment, and a large cloud-shaped trampoline. Admission is expected to be free.

    The former workshop sits near the boundary between Lingya (苓雅) and Fengshan (鳳山) districts.

    The wider railway site covers about 32 hectares and became available for redevelopment after maintenance operations were moved to Chaozhou (潮州) in Pingtung County.

    Rather than demolishing the original freight-car workshop, the city retained much of its industrial structure and railway character.

    City officials said the project is intended to preserve an important part of Kaohsiung’s transportation history while returning an inactive industrial site to public use.

    Mayor Chen Chi-mai (陳其邁) heard a briefing on the opening plan this week and asked city agencies to finalize traffic, crowd control, and safety measures.

    The city said preparations include shuttle bus arrangements, parking management, drinking-water stations, medical posts, toilets, signs, and public transport guidance.

    Final operating hours and opening-day access controls had not been formally announced as of July 31.

    Featured Kaohsiung redevelopment things to do in Kaohsiung
    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    Local Band Elephant Gym Opens “Micro Movement” Recording Studio

    September 14, 2026

    First section of NT$98 billion Kaohsiung-Pingtung expressway to break ground

    September 14, 2026

    Man rescued after four days trapped in mud in Kaohsiung mountains

    September 14, 2026
    Add A Comment

    Comments are closed.

    Local Band Elephant Gym Opens “Micro Movement” Recording Studio

    September 14, 2026

    First section of NT$98 billion Kaohsiung-Pingtung expressway to break ground

    September 14, 2026

    Man rescued after four days trapped in mud in Kaohsiung mountains

    September 14, 2026

    Kaohsiung’s President Department Store Wufu building demolished after 51 years

    September 14, 2026

    Pingtung joins nationwide e-cigarette collection campaign ahead of proposed max 100K fines

    September 14, 2026

    Local Band Elephant Gym Opens “Micro Movement” Recording Studio

    First section of NT$98 billion Kaohsiung-Pingtung expressway to break ground

    Man rescued after four days trapped in mud in Kaohsiung mountains

    Kaohsiung’s President Department Store Wufu building demolished after 51 years

    Pingtung joins nationwide e-cigarette collection campaign ahead of proposed max 100K fines

    OPINION: After NT$8.1 billion overhaul, migrant fishers still lack showers at Cianjhen port

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Contact Info
    • Privacy Policy & GDPR
    © 2026 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.