Close Menu
Kaohsiung Times

    Tainan station to lead Taiwan’s next push for lower-carbon rail hubs

    Freeway No. 7 inches toward construction, but land deals still hold the key

    Land dispute threatens to slow second Kaohsiung-Pingtung expressway

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Monday, April 27
    Facebook X (Twitter) Instagram
    • Latest
    • Kaohsiung
    • South
      • Pingtung
      • Tainan
      • Chiayi
    • Crime
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Politics
    • Lifestyle
      • Sports
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Kaohsiung
    • South
    • Crime
    • Business
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » Freeway No. 7 inches toward construction, but land deals still hold the key
    Transportation April 27, 20262 Mins Read

    Freeway No. 7 inches toward construction, but land deals still hold the key

    The long-delayed Kaohsiung route has entered procurement for some sections, but officials still face land acquisition hurdles before the project can fully move ahead
    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    By RK Shih/Staff. Images via National Freeway Bureau, MOTC.

    KAOHSIUNG — The long-delayed National Freeway No. 7 project is showing new signs of movement, with parts of the 23-kilometer Kaohsiung route entering the tendering process after years of planning, environmental review, and local opposition.

    But the project has not yet crossed the finish line from paperwork to full construction. The Highways Bureau’s latest public update shows several sections are still under design, while others have only recently moved into public review or online tendering. Land acquisition also remains a major issue, with local reports saying negotiated purchases have reached about 70 percent.

    National Freeway No. 7’s Kaohsiung section is planned as a roughly 23-kilometer route from National Freeway No. 10 to Nansing Road (南星路), passing through or near Renwu (仁武), Niaosong (鳥松), Fongshan (鳳山), Daliao (大寮), Siaogang (小港), and Linyuan (林園). The route is designed to include five regular interchanges and two system interchanges, with completion currently listed for 2030, a timetable that many say is unrealistic. But, the freeway could open in stages as has happened for other such projects.

    The budget has risen to about NT$150.17 billion, after the Executive Yuan approved a revised construction plan in August 2025 that added NT$14.38 billion because land acquisition costs were insufficient.

    The Highways Bureau’s own procurement page shows the project has been divided into sections. As of its April 8 update, the C701S Renwu section and C702S Niaosong section were still under design; the C703S Fongliao section had undergone public review; the C705S Siaogang section had its first online tender announcement on Feb. 11, 2026; and the C706S Linhai section had tender announcements on Nov. 5, 2025, and Jan. 16, 2026.

    The official rationale is that Freeway No. 7 would relieve traffic on National Freeway No. 1 south of Nanzih (楠梓), reduce pressure on the Dingjin (鼎金) and Wujia (五甲) system interchanges, ease backups between Provincial Highway 88 and Freeway No. 1, and move heavy industrial and port-related traffic away from urban roads.

    Featured Kaohsiung transportation
    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    Tainan station to lead Taiwan’s next push for lower-carbon rail hubs

    April 27, 2026

    Land dispute threatens to slow second Kaohsiung-Pingtung expressway

    April 27, 2026

    New on FORMOSA FILES – The Taiwan History Podcast

    April 27, 2026
    Add A Comment

    Comments are closed.

    Tainan station to lead Taiwan’s next push for lower-carbon rail hubs

    April 27, 2026

    Land dispute threatens to slow second Kaohsiung-Pingtung expressway

    April 27, 2026

    New on FORMOSA FILES – The Taiwan History Podcast

    April 27, 2026

    Mayoral race heats up after Ko Chih-en unveils “crowdfunding” youth startups plan

    April 27, 2026

    Bad road design or just bad habits? Kaohsiung camera catches nearly 1,900 violations in 3 months

    April 27, 2026

    Tainan station to lead Taiwan’s next push for lower-carbon rail hubs

    Freeway No. 7 inches toward construction, but land deals still hold the key

    Land dispute threatens to slow second Kaohsiung-Pingtung expressway

    New on FORMOSA FILES – The Taiwan History Podcast

    Mayoral race heats up after Ko Chih-en unveils “crowdfunding” youth startups plan

    Bad road design or just bad habits? Kaohsiung camera catches nearly 1,900 violations in 3 months

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Contact Info
    • Privacy Policy & GDPR
    © 2026 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.