Close Menu
Kaohsiung Times
    What's Hot

    DPP Tainan Mayoral Primary Enters Final Stretch as Chen Ting-fei and Lin Chun-hsien Make Last Push

    Taiwan Launches Biggest Intercity Bus Network Overhaul in 30 Years

    “Wise Beyond its Size – 60 Lessons from 60 Years of Singapore” – Chapter 2: The Little Red Dot — A Global Leader in Development Achievements

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Sunday, January 11
    Facebook X (Twitter) Instagram
    • Latest
    • Local
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Pingtung
    • Politics
    • Lifestyle
      • Sports
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Local
    • Business
    • Pingtung
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » Kaohsiung’s Daliao Social Housing Showcases Smart, Green Design — Completion Set for Late 2026
    Business October 3, 20252 Mins Read

    Kaohsiung’s Daliao Social Housing Showcases Smart, Green Design — Completion Set for Late 2026

    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    The Daliao Social Housing Project, features two 10-story buildings with two basement levels, providing 384 units for rent only, offering affordable housing options near the Orange Line’s Daliao MRT Station (Exit 2).

    By RK Shih/ Staff

    Kaohsiung City is fast-tracking construction of its newest public housing project in Daliao District, combining smart-home features with green building design. Deputy Mayor Lin Chin-jung (林欽榮) unveiled a model unit this week, highlighting a “smart and secure” residential complex designed for comfort, accessibility, and sustainability. The project is ahead of schedule by 4.36% and set for completion in the third quarter of 2026, with move-in beginning December 2026.

    The Daliao Social Housing Project, managed by the Water Resources Bureau, features two 10-story buildings with two basement levels, providing 384 units in various layouts — studios, one-, two-, and three-bedroom apartments. All units are for rent only, offering affordable housing options near the Orange Line’s Daliao MRT Station (Exit 2).

    Deputy Mayor Lin said each unit was designed with ample natural light and ventilation, soundproof flooring, and accessible bathrooms equipped with same-floor drainage systems for easy maintenance. The buildings incorporate “silver-grade” green architecture standards and age-friendly, barrier-free design, ensuring livability for residents of all ages.

    According to the Liberty Times, The Water Resources Bureau noted the project’s progress has reached 71.1%, with façade work, interior partitions, and mechanical systems now underway. Lin led a walkthrough with members of the city’s Housing Review Committee to gather feedback and optimize future designs.

    Kaohsiung has accelerated its public housing program citywide, with ongoing investments in smart technology, green infrastructure, and community-centered design. The Daliao complex is part of Mayor Chen Chi-mai’s (陳其邁) broader initiative to expand affordable, high-quality housing while improving the city’s overall livability and environmental performance.

    Once completed, the project will provide residents with modern, sustainable living spaces in a well-connected neighborhood — reflecting Kaohsiung’s commitment to inclusive urban development and innovation-driven housing solutions.

    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    Neimen District “Wild Forest Animal School” to Soft Open January 17, Daily Cap Set at 1,000 Visitors

    January 11, 2026

    Taiwan expands search for missing F-16V pilot as rough seas complicate rescue

    January 10, 2026

    Kaohsiung’s Startup Expo Subsidy: Up to NT$100,000, Lifetime 2x, Now Open

    January 9, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Related Posts

    Neimen District “Wild Forest Animal School” to Soft Open January 17, Daily Cap Set at 1,000 Visitors

    January 11, 2026

    Taiwan expands search for missing F-16V pilot as rough seas complicate rescue

    January 10, 2026

    Kaohsiung’s Startup Expo Subsidy: Up to NT$100,000, Lifetime 2x, Now Open

    January 9, 2026

    Kaohsiung Hotels Get Green Light to Hire Overseas Staff, but NT$32K Pay Sparks Backlash

    January 9, 2026

    Gangshan Station “Step-Off-the-Train, Go-Home” Housing Landmark Breaks Ground in Northern Kaohsiung

    January 8, 2026
    Latest Posts

    DPP Tainan Mayoral Primary Enters Final Stretch as Chen Ting-fei and Lin Chun-hsien Make Last Push

    Taiwan Launches Biggest Intercity Bus Network Overhaul in 30 Years

    “Wise Beyond its Size – 60 Lessons from 60 Years of Singapore” – Chapter 2: The Little Red Dot — A Global Leader in Development Achievements

    About 50 Rally in Kaohsiung Against Abolition of Death Penalty

    Neimen District “Wild Forest Animal School” to Soft Open January 17, Daily Cap Set at 1,000 Visitors

    KMT’s Ko Chih-en Slams DPP “Succession” Fight as Kaohsiung Primary Heats Up

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Contact Info
    • Privacy Policy & GDPR
    • Media Kits
    © 2026 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.