Close Menu
Kaohsiung Times

    Local Band Elephant Gym Opens “Micro Movement” Recording Studio

    First section of NT$98 billion Kaohsiung-Pingtung expressway to break ground

    Man rescued after four days trapped in mud in Kaohsiung mountains

    Facebook X (Twitter) Instagram Threads
    Kaohsiung Times
    Monday, September 14
    Facebook X (Twitter) Instagram
    • Latest
    • Kaohsiung
    • South
      • Pingtung
      • Tainan
      • Chiayi
    • Crime
    • Business
      • ESG
      • Technology
      • Energy
      • Real Estate
    • Politics
    • Lifestyle
      • Sports
      • Health
      • Entertainment
      • Travel
    • Long-form
      • Editorials
      • Formosa Files
      • Article Series
      • Books
    • Youth
    Kaohsiung Times
    • Latest
    • Kaohsiung
    • South
    • Crime
    • Business
    • Politics
    • Lifestyle
    • Long-form
    • Youth
    Home » First section of NT$98 billion Kaohsiung-Pingtung expressway to break ground
    Transportation September 14, 20262 Mins Read

    First section of NT$98 billion Kaohsiung-Pingtung expressway to break ground

    The 880-meter Jiuru section is scheduled to start Sept. 28, although the full 22.6-kilometer route will not be completed until 2033
    Share
    Facebook Twitter LinkedIn Email Copy Link Threads

    By KHT Staff

    PINGTUNG — Construction of the first section of a long-awaited expressway linking northern Pingtung with Kaohsiung and Zuoying HSR Station is scheduled to begin Sept. 28.

    The NT$98 billion Kaohsiung-Pingtung Second East-West Expressway, commonly called the Kaohsiung-Pingtung Second Expressway (高屏二快), will run 22.6 kilometers from the intersection of Taiwan Provincial Highway 1 and Gaotie Road (高鐵路) in Zuoying (左營) to National Freeway 3 in Jiuru (九如).

    The first contract, known as C1, covers only 880 meters in Jiuru’s Yushui area (玉水地區). A groundbreaking ceremony is scheduled for Sept. 28, according to United Daily News, with the section expected to be completed in 2029. The full expressway, divided into seven construction contracts, is scheduled for completion in 2033.

    The C1 section will cost about NT$3.5 billion. It includes a four-lane elevated bridge crossing Taiwan Provincial Highway 3 (台3線), westbound entrance and eastbound exit ramps, surface roads, and pedestrian and bicycle facilities. The route is designed for speeds of up to 90 kilometers per hour.

    Although construction is beginning from the Pingtung end, the short C1 section will not by itself provide a direct route to Kaohsiung. Its importance is that it marks the first physical work on the larger project after years of planning, environmental review and route changes.

    More than 20 kilometers of the expressway will be elevated, helping explain the project’s high cost. The complete route will include three freeway-system interchanges and five local interchanges, connecting with National Freeways 1, 3 and 10, the future National Freeway 7, and several major provincial and city roads.

    The government developed the route to relieve pressure on Taiwan Provincial Highway 1 and Expressway 88, which are the main east-west links between Kaohsiung and Pingtung and regularly become congested during peak periods.

    The Public Construction Commission estimates that the completed expressway will reduce travel time between Changzhi (長治) and Zuoying from about 50 minutes to 30 minutes. Jiuru Township Mayor Lan Tsung-hsin (藍聰信) has offered a more optimistic local estimate of about 20 minutes between Jiuru and Zuoying HSR Station.

    The road is also intended to connect industrial and technology areas across the Kaohsiung-Pingtung region, including the Kaohsiung S Corridor and Pingtung’s science and agricultural technology parks.

    Featured Freeway Bureau Kaohsiung transportation Pingtung Transportation
    Share. Facebook Twitter Threads LinkedIn Email Copy Link

    Related Posts

    Local Band Elephant Gym Opens “Micro Movement” Recording Studio

    September 14, 2026

    Man rescued after four days trapped in mud in Kaohsiung mountains

    September 14, 2026

    Kaohsiung’s President Department Store Wufu building demolished after 51 years

    September 14, 2026
    Add A Comment

    Comments are closed.

    Local Band Elephant Gym Opens “Micro Movement” Recording Studio

    September 14, 2026

    Man rescued after four days trapped in mud in Kaohsiung mountains

    September 14, 2026

    Kaohsiung’s President Department Store Wufu building demolished after 51 years

    September 14, 2026

    Pingtung joins nationwide e-cigarette collection campaign ahead of proposed max 100K fines

    September 14, 2026

    OPINION: After NT$8.1 billion overhaul, migrant fishers still lack showers at Cianjhen port

    September 13, 2026

    Local Band Elephant Gym Opens “Micro Movement” Recording Studio

    First section of NT$98 billion Kaohsiung-Pingtung expressway to break ground

    Man rescued after four days trapped in mud in Kaohsiung mountains

    Kaohsiung’s President Department Store Wufu building demolished after 51 years

    Pingtung joins nationwide e-cigarette collection campaign ahead of proposed max 100K fines

    OPINION: After NT$8.1 billion overhaul, migrant fishers still lack showers at Cianjhen port

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • Local
    • Business
    • Sports
    • Politics
    • Opinions
    • Lifestyle
    • Health

    News

    • Entertainment
    • Travel
    • Formosa FIles
    • Books
    • Technology
    • Youth
    • Latest

    Company

    • Information
    • Advertising
    • Contact Info
    • Privacy Policy & GDPR
    © 2026 Kaohsiung Times. Developed by Second Space.
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.