Urban Future
The project is expected to be finished by the end of June, with trial operations likely during the summer vacation period. All facilities will be free to use.
The civic Facebook page 高雄好過日 (@takaogooday) reported that NT$150 million has been secured for the restoration of the Imperial Crown-style old station building (帝冠車站), with the Kaohsiung City Bureau of Cultural Affairs (高雄市政府文化局) expected to handle the project on behalf of Taiwan Railway Corp. The project is expected to be tendered as early as July, with restoration taking about 18 months to two years and possible completion in 2028, according to the post. The restoration funding and timeline were also reported by Yahoo News, citing local reporting.
Local officials argue that Fongshan, Kaohsiung’s most populous district with over 350,000 residents, should be considered as a future transport hub. Legislator Hsu Chih-chieh (許智傑) and several Fongshan representatives previously suggested that a high-speed rail station could be integrated with the existing Taiwan Railways Fongshan Station (鳳山車站).
The Pingtung County Government said the project is intended to ease traffic through central Fangliao, where heavy holiday traffic, frequent traffic lights, and local congestion have long slowed vehicles moving through southern Pingtung.
Deputy Mayor Lin Chin-rong (林欽榮) said the project is intended to meet rising demand from semiconductor professionals as TSMC’s facilities in Nanzih move forward.
Residents in Fongshan District (鳳山區) are calling for a planned Kaohsiung MRT Yellow Line station to be named Cilaoye (七老爺 – Qīlǎoyé), saying the historic place name should be preserved as the line expands into the area.
Sixteen new stations are expected to open over the next 10 years, with Tainan’s underground station scheduled to be the first of them to open by the end of 2026.
The long-delayed National Freeway No. 7 project is showing new signs of movement, with parts of the 23-kilometer Kaohsiung route entering the tendering process after years of planning, environmental review, and local opposition.
The Highway Bureau said plans call for the expressway to run about 22.6 kilometers from the Zuoying High Speed Rail Station (高鐵左營站) area, passing National Freeways No. 7 and No. 10 before crossing the Kaoping River and connecting with National Freeway No. 3. The four-lane route is planned to include three system interchanges and five local ramps.
Kaohsiung City Councilor Huang Wen-yi (黃文益) says the district’s street character makes it suitable for outdoor seating and night-time activity. He suggested allowing shops to place tables and chairs on sidewalks, provided pedestrian access and public safety are not affected.