Pingtung

The Highway Bureau said plans call for the expressway to run about 22.6 kilometers from the Zuoying High Speed Rail Station (高鐵左營站) area, passing National Freeways No. 7 and No. 10 before crossing the Kaoping River and connecting with National Freeway No. 3. The four-lane route is planned to include three system interchanges and five local ramps.

One coffee grower in Majia Township (瑪家鄉), a five-time Pingtung coffee evaluation champion, uses drying grounds located on the Hengchun Peninsula. They’ve adapted a traditional local drying method that uses the strong seasonal luoshanfeng, or downslope winds to turn the cherries into coffee beans.